Elektrarny Opatovice, CZE - Replacement of the steam station 5-14
Trinecke zelezarny, CZE - Repair of dust filter VP No. 4
Complete repair of dust filter and gas pipelines of blast furnace No. 4 and related inlet and outlet pipelines and steel constructions realized in TRINECKE ZELEZARNY, a.s.
The subject of the work was the supply of materials, production of piping and anther segments and their assembly, production of steel structure and all activities related to the execution of the contract (quality documentation of deliveries, certificates and attestations, waste weighing cards etc.).
Opole Power Plant 2 x 910 MWe - Installation of high pressure pipelines TP5, TP6
Obrenovac power plant, Serbia - procurement of material
Ugljevik power plant, Bosnia and Herzegovina - Steam Inter Super-heaters (MPP-1)
Delivery, production and assembly of the steam inter super-heaters (MPP-1) in the amount of 2,7 mil. Eur. The project was cooperated with the subsidiary EURO-MONT-ING.
Opole power plant, Poland - ESP and Insulation
The project consisted of the two parts:
1. The delivery and assembly of the electrostatic precipitators in the total value 5.500.000 Euro
2. The delivery and erection of the cladding and thermal insulation of the electrostatic precipitators in the approx. value 2.200.000 Euro.
Ugljevik power plant, Bosnia and Herzegovina - Reconstruction of electrostatic precipitator
ZK - TERMOCHEM s.r.o. realized in consortium with ZVVZ-Enven Engineering a.s.. project "Reconstraction of the electrostatic precipitator". The total project consisted of the elaboration of the design, procurement, production and assembly of ESP in the total value 9,6 mil. Euro. The scope of ZK - TERMOCHEM included procurement, production and the total assembly of the electrostatic precipitator.
Opole power plant, Poland - turbine pipeline
The project included the installation of turbine pipelines for TP5 and TP6 units.
Opatovice power plant, Czech republic - Coolers reconstruction
The subject of this project was the reconstruction of the turbogenerator coolers No. 3 (TG3), including the elaboration of the project documentation and the supply of the material.
Kozienice power plant 1050 MWe, Poland - boiler pipelines
Erection of piping of supercritical boiler and external piping on the supercritical unit K11 (including pipes from material X10CrWMoVNb9-2 up to the wall thickness 125 mm).
Kozienice power plant 1050 MWe, Poland - superheater
Connection piping for superheater on the supercritical unit K11.
Nikola Tesla B power plant 600 MWe, Obrenovac, Serbia
The project was composed of elaboration of the detail design, supply of material, prefabrication and erection of RG line (which is mainly produced from material 15NiCuMoNb5-6-4).
Incineration unit Severnside, Bristol, United Kingdom
Erection of complete connection piping on two units.
Conversion of Electrostatic Precipitator into Hybrid Filter – Plzen, Czech Republic
Manufacturing, supply, dismantling and erection of steel structures, plate-work, internal equipment (hybrid filter – ESP/bag-filter)
Sostanj power plant – 600 MWe, Slovenia
Erection of boiler
Packet 3, 4 and 5 including all the related site works.
Opatovice power plant, Czech Republic
ZK - TERMOCHEM was engaged as EPC contractor for two projects:
1. Exchange of preheaters on 4 blocks
2. Replacement of precipitators
(Precipitators were realized in consortium with Hamon Environmental).
Mannheim power plant 900 MWe, Germany
Erection works at boiler including packet 3 and 4.
Design and works for the Emission Reduction from Nikola Tesla TPP, Unit B1, Obrenovac
The works comprised the upgrade of Electrostatic Precipitator System reducing the particulate emissions from TPP TENT B, Unit B1, below LCPD particulate emission limits (50mg/Nm3).The project consisted of design, delivery of material and assembly of the electrostatic precipitator system. The project was realized in consortium with Hamon Environmental. ZK - TERMOCHEM was responsible for design (partly) and for delivery of material, prefabrication, assembly of all the electrostatic precipitator system and all the related works on the site and commissioning.
Ledvice power plant, New Unit 660 MWe , Czech Republic
Erection of supercritical high pressure piping (including also pipes from material X10CrWMoVNb9-2 with wall thickness up to 82 mm).
Köln-NIEHL power plant, Germany
Fabrication and erection of internal connecting piping
Irsching power plant, Germany
Complete fabrication and erection of high pressure pipe system
Tusimice Power Plant - 2x200 MWe – phase 1, Czech Republic
Critical high pressure piping OB61.
Tusimice Power Plant II - 2x200 MWe – phase 2, Czech Republic
Critical high pressure piping OB5 and OB61.
Moorburg power plant, Germany
Erection of pressure piping
Package 4, units A + B.
Neurath Power plant - 2 x 1100 MWe, Germany
ZK - TERMOCHEM was engaged in several parts of this project:
1. Erection of super-critical internal connection pipeline (package 3) for unit F and G
2. Erection of economiser and other works for unit F and G
3. Erection of ducts for unit G.
Knapsack Combined Cycle Gas Fired Power Plant, Germany
Fabrication and erection of high pressure steam pipeline.
Thermal power plant, Azerbaijan
Prefabrication of pipes and piping components for conventional power plant in Azerbaijan.
Neurath power plant - 2 x 1100 MWe, Germany (cooling water pipeline)
ZK - TERMOCHEM realized the assembly of the cooling water pipeline for two production units in power plant Neurath 2 x 1100 MWe in Germany in 2015. The total value of the contact was 3,48 mil. Eur ( 2 x 1,74 mil Eur).