Elektrarny Opatovice, CZE - Replacement of the steam station 5-14

Customer: Elektrárny Opatovice, a.s.
Investor: Elektrárny Opatovice, a.s.

Value: 29 361 000 CZK
Season: 2018 - 2019

Capacity:

Description: Delivery and complete replacement of the existing medium-pressure steam collector 5–14 bar based on project documentation in three partial fillings: pipeline of the lower branch of the 1st section (blocks TG1 and TG2) and the lower branch of the II. sections (blocks TG 3 and TG 4); pipeline of the lower and upper branches III. sections (blocks TG 5 and TG 6); pipeline of the upper branch I, and II. section (TG 1, TG 2, TG 3 and TG 4)

Trinecke zelezarny, CZE - Repair of dust filter VP No. 4

Customer: Třinecký inženýring, a. s.
Investor: Třinecké železárny, a. s.

Value: 28 563 552 CZK
Season: 2018 - 2019

Capacity:

Description:

Complete repair of dust filter and gas pipelines of blast furnace No. 4 and related inlet and outlet pipelines and steel constructions realized in TRINECKE ZELEZARNY, a.s.

The subject of the work was the supply of materials, production of piping and anther segments and their assembly, production of steel structure and all activities related to the execution of the contract (quality documentation of deliveries, certificates and attestations, waste weighing cards etc.).



Opole Power Plant 2 x 910 MWe - Installation of high pressure pipelines TP5, TP6

Customer: GE Power sp. z o.o
Investor: PGE Elektrownia Opole S.A.

Value: 9 585 000 EUR
Season: 2016 - 2018

Capacity: 55 workers

Description: Installation of high pressure pipelines together with hinges - blocks 5 a 6

Obrenovac power plant, Serbia - procurement of material

Customer: EPS - Elektroprivreda Srbsko
Investor: EPS - Elektroprivreda Srbsko

Value: 1 700 000 Eur
Season: 2017

Capacity: 10 employees

Description:

Ugljevik power plant, Bosnia and Herzegovina - Steam Inter Super-heaters (MPP-1)

Customer: ZP Rudnik i Termoelektrana Ugljevik AD Ugljevik
Investor: ZP Rudnik i Termoelektrana Ugljevik AD Ugljevik

Value: 2,7 mil. Eur
Season: 2016 - 2017

Capacity: 50 employees

Description:

Delivery, production and assembly of the steam inter super-heaters (MPP-1) in the amount of 2,7 mil. Eur. The project was cooperated with the subsidiary EURO-MONT-ING.

Opole power plant, Poland - ESP and Insulation

Customer: GE Power sp. z o.o.
Investor: PGE Elektrownia Opole S.A.

Value: 7 700 000 Euro
Season: 2017

Capacity: 100 eployees
Gallery: Show

Description:

The project consisted of the two parts:

1. The delivery and assembly of the electrostatic precipitators in the total value 5.500.000 Euro

2. The delivery and erection of the cladding and thermal insulation of the electrostatic precipitators in the approx. value 2.200.000 Euro.

Ugljevik power plant, Bosnia and Herzegovina - Reconstruction of electrostatic precipitator

Customer: Holding of Elektroprivreda Republike Srpske and Rudnik i Termoelektrana Ugljevik
Investor: Holding of Elektroprivreda Republike Srpske and Rudnik i Termoelektrana Ugljevik

Value: 9.599.000 Eur
Season: 2016 - 2017

Capacity: 120

Description:

ZK - TERMOCHEM s.r.o. realized in consortium with ZVVZ-Enven Engineering a.s.. project "Reconstraction of the electrostatic precipitator". The total project consisted of the elaboration of the design, procurement, production and assembly of ESP in the total value 9,6 mil. Euro. The scope of ZK - TERMOCHEM included procurement, production and the total assembly of the electrostatic precipitator.

Opole power plant, Poland - turbine pipeline

Customer: Polimex Energetyka Sp. z o.o.
Investor: PGE Elektrownia Opole S.A.

Value: 2 000 000 Eur
Season: 2017

Capacity: 50 employess

Description:

The project included the installation of turbine pipelines for TP5 and TP6 units.

Opatovice power plant, Czech republic - Coolers reconstruction

Customer: Elektrárny Opatovice, a.s.
Investor: Elektrárny Opatovice, a.s.

Value: 200 000 Eur
Season: 2017

Capacity: 20 employees

Description:

The subject of this project was the reconstruction of the turbogenerator coolers No. 3 (TG3), including the elaboration of the project documentation and the supply of the material.

Kozienice power plant 1050 MWe, Poland - boiler pipelines

Customer: Polimex Mostostal
Investor: Elektrownia Wytwarzanie S.A.

Value: 7.300.000 €
Season: 2015 – 2016

Capacity: 150 employees

Description:

Erection of piping of supercritical boiler and external piping on the supercritical unit K11 (including pipes from material X10CrWMoVNb9-2 up to the wall thickness 125 mm).

Kozienice power plant 1050 MWe, Poland - superheater

Customer: Polimex Mostostal
Investor: Elektrownia Wytwarzanie S.A.

Value: 2.400.000 €
Season: 2015 - 2016

Capacity: 40

Description:

Connection piping for superheater on the supercritical unit K11.

Nikola Tesla B power plant 600 MWe, Obrenovac, Serbia

Customer: PE ЕPS Belgrade - TENT B, Serbia
Investor: PE ЕPS Belgrade - TENT B, Serbia

Value: 1.000.000 €
Season: 2015

Capacity: 45 employees

Description:

The project was composed of elaboration of the detail design, supply of material, prefabrication and erection of RG line (which is mainly produced from material 15NiCuMoNb5-6-4).

Incineration unit Severnside, Bristol, United Kingdom

Customer: Hitachi Zosen Inova
Investor: SITA UK

Value: 2.400.000 €
Season: 2014 – 2015

Capacity: 60 employees

Description:

Erection of complete connection piping on two units.

Conversion of Electrostatic Precipitator into Hybrid Filter – Plzen, Czech Republic

Customer: Hamon RC, Germany
Investor: Plzenska teplarenska, a.s., Czech Rep.

Value: 750.000 €
Season: 2014

Capacity: 30 employees

Description:

Manufacturing, supply, dismantling and erection of steel structures, plate-work, internal equipment (hybrid filter – ESP/bag-filter)

Sostanj power plant – 600 MWe, Slovenia

Customer: Alstom Power Stuttgart
Investor: Termoelektrarna Sostanj

Value: 10.000.000 €
Season: 2013 – 2014

Capacity: 135 employees

Description:

Erection of boiler
Packet 3, 4 and 5 including all the related site works.

Opatovice power plant, Czech Republic

Customer: Eletrárny Opatovice, a.s.
Investor: Eletrárny Opatovice, a.s.

Value: 10.000.000 €
Season: 2014 – 2015

Capacity: 120 employees

Description:

ZK - TERMOCHEM was engaged as EPC contractor for two projects:
1. Exchange of preheaters on 4 blocks
2. Replacement of precipitators
(Precipitators were realized in consortium with Hamon Environmental).

Mannheim power plant 900 MWe, Germany

Customer: Alstom Power Stuttgart
Investor: GKM AG

Value: 7.800.000 €
Season: 2013

Capacity: 130 employees

Description:

Erection works at boiler including packet 3 and 4.

Design and works for the Emission Reduction from Nikola Tesla TPP, Unit B1, Obrenovac

Customer: PE ЕPS Belgrade - TENT B, Serbia
Investor: Delegation of EU to the Republic of Serbia

Value: 10.000.000 €
Season: 2011 – 2013

Capacity: 130 employees

Description:

The works comprised the upgrade of Electrostatic Precipitator System reducing the particulate emissions from TPP TENT B, Unit B1, below LCPD particulate emission limits (50mg/Nm3).The project consisted of design, delivery of material and assembly of the electrostatic precipitator system. The project was realized in consortium with Hamon Environmental. ZK - TERMOCHEM was responsible for design (partly) and for delivery of material, prefabrication, assembly of all the electrostatic precipitator system and all the related works on the site and commissioning.

Ledvice power plant, New Unit 660 MWe , Czech Republic

Customer: MODŘANY Power , a.s. (ŠKODA POWER, a.s., ŠKODA PRAHA Invest s.r.o.)
Investor: ČEZ, a.s.

Value: 10.000.000 €
Season: 2011 – 2014

Capacity: 100 employees

Description:

Erection of supercritical high pressure piping (including also pipes from material X10CrWMoVNb9-2 with wall thickness up to 82 mm).

Köln-NIEHL power plant, Germany

Customer: Voest Alpine Montage Austria
Investor: Siemens-Germany

Value: 1.200.000 €
Season: 2003 - 2004

Capacity: 50 employees

Description:

Fabrication and erection of internal connecting piping

Irsching power plant, Germany

Customer: Voest Alpine Montage Austria
Investor: EON Germany

Value: 1.250.000 €
Season: 2007 - 2008

Capacity: 50 employees

Description:

Complete fabrication and erection of high pressure pipe system

Tusimice Power Plant - 2x200 MWe – phase 1, Czech Republic

Customer: Vítkovice Power Engineering a.s. (MODŘANY Power, a.s., ŠKODA PRAHA Invest s.r.o.)
Investor: ČEZ, a.s.

Value: 2.800.000 €
Season: 2008 – 2009

Capacity: 54 employees

Description:

Critical high pressure piping OB61.

Tusimice Power Plant II - 2x200 MWe – phase 2, Czech Republic

Customer: MODŘANY Power, a.s. (ŠKODA POWER, a.s., ŠKODA PRAHA Invest s.r.o.)
Investor: ČEZ, a.s.

Value: 4.000.000 €
Season: 2010 – 2011

Capacity: 85 employees

Description:

Critical high pressure piping OB5 and OB61.

Moorburg power plant, Germany

Customer: HITACHI POWER SYSTEM
Investor: Vattenfall

Value: 4.000.000 €
Season: 2011 – 2012

Capacity: 75 employees

Description:

Erection of pressure piping
Package 4, units A + B.

Neurath Power plant - 2 x 1100 MWe, Germany

Customer: Alstom & Hitachi
Investor: RWE Germany

Value: 13.100.000 €
Season: 2009 - 2012

Capacity: 140 employees

Description:

ZK - TERMOCHEM was engaged in several parts of this project:
1. Erection of super-critical internal connection pipeline (package 3) for unit F and G
2. Erection of economiser and other works for unit F and G
3. Erection of ducts for unit G.

Knapsack Combined Cycle Gas Fired Power Plant, Germany

Customer: Voest Alpine Montage-Austria
Investor: Statkraft

Value: 1.200.000 €
Season: 2006 - 2007

Capacity: 50 employees

Description:

Fabrication and erection of high pressure steam pipeline.

Thermal power plant, Azerbaijan

Customer: VAM GmbH & Anlagentechnik und Montagen
Investor:

Value: 200.000 €
Season: 2007

Capacity: 30 employees

Description:

Prefabrication of pipes and piping components for conventional power plant in Azerbaijan.

Neurath power plant - 2 x 1100 MWe, Germany (cooling water pipeline)

Customer: Voest Alpine Montage Austria
Investor: RWE Germany

Value: 3 mil. Eur
Season: 2009-2010

Capacity:
Gallery: Show

Description:

ZK - TERMOCHEM realized the assembly of the cooling water pipeline for two production units in power plant Neurath 2 x 1100 MWe in Germany in 2015. The total value of the contact was 3,48 mil. Eur ( 2 x 1,74 mil Eur).