Neurath power plant - 2 x 1100 MWe, Germany (cooling water pipeline)

Customer: Voest Alpine Montage Austria
Investor: RWE Germany

Value: 3 mil. Eur
Season: 2009-2010

Capacity: 80 employees
Gallery: Show

Description:

ZK - TERMOCHEM realized the assembly of the cooling water pipeline for two production units in power plant Neurath 2 x 1100 MWe in Germany in 2015. The total value of the contact was 3,48 mil. Eur ( 2 x 1,74 mil Eur).


Ugljevik power plant, Bosnia and Herzegovina

Customer: ZP Rudnik i Termoelektrana Ugljevik AD Ugljevik
Investor: ZP Rudnik i Termoelektrana Ugljevik AD Ugljevik

Value: 12,3 mil. Eur
Season: 2016 - 2017

Capacity: 120 employees

Description:

ZK - TERMOCHEM realized two projects in power plant Ugljevik, which is located in Bosnia and Herzegovina. The total value of both projects was 12,3 mil. Eur. The two projects were:

1. Design, procurement, production and assembly of ESP in the total value 9,6 mil. Eur. The project was implemented in cooperation with ZVVZ-Enven Engineering.

2. Design, procurement, production and assembly of the steam inter super-heaters (MPP-1) in the amount of 2,7 mil. Eur. The project was cooperated with the subsidiary EURO-MONT-ING.

Obrenovac power plant, Serbia - procurement of material

Customer: EPS - Elektroprivreda Srbsko
Investor: EPS - Elektroprivreda Srbsko

Value: 1 700 000 Eur
Season: 2017

Capacity: 10 employees

Description:

Opole power plant, Poland - Insulation

Customer: GE Power sp. z o.o.
Investor: PGE Elektrownia Opole S.A.

Value: 2 200 000 Euro
Season: 2017

Capacity: 30 eployees

Description:

The delivery and erection of the cladding and thermal insulation of the electrostatic precipitators.

Opole power plant, Poland - turbine pipeline

Customer: Polimex Energetyka Sp. z o.o.
Investor: PGE Elektrownia Opole S.A.

Value: 2 000 000 Eur
Season: 2017

Capacity: 50 employess

Description: The project included the installation of turbine pipelines for TP5 and TP6 units.

Opatovice power plant, Czech republic - Elektrárna Opatovice, Česká republika - Coolers reconstruction

Customer: Elektrárny Opatovice, a.s.
Investor: Elektrárny Opatovice, a.s.

Value: 200 000 Eur
Season: 2017

Capacity: 20 employees

Description: The subject of this project was the reconstruction of the turbogenerator coolers No. 3 (TG3), including the elaboration of the project documentation and the supply of the material.

Kozienice power plant 1050 MWe, Poland - boiler pipelines

Customer: Polimex Mostostal
Investor: Elektrownia Wytwarzanie S.A.

Value: 7.300.000 €
Season: 2015 – 2016

Capacity: 150 employees

Description:

Erection of piping of supercritical boiler and external piping on the supercritical unit K11 (including pipes from material X10CrWMoVNb9-2 up to the wall thickness 125 mm).

Kozienice power plant 1050 MWe, Poland - superheater

Customer: Polimex Mostostal
Investor: Elektrownia Wytwarzanie S.A.

Value: 2.400.000 €
Season: 2015 - 2016

Capacity: 40

Description:

Connection piping for superheater on the supercritical unit K11.

Nikola Tesla B power plant 600 MWe, Obrenovac, Serbia

Customer: PE ЕPS Belgrade - TENT B, Serbia
Investor: PE ЕPS Belgrade - TENT B, Serbia

Value: 1.000.000 €
Season: 2015

Capacity: 45 employees

Description:

The project was composed of elaboration of the detail design, supply of material, prefabrication and erection of RG line (which is mainly produced from material 15NiCuMoNb5-6-4).

Incineration unit Severnside, Bristol, United Kingdom

Customer: Hitachi Zosen Inova
Investor: SITA UK

Value: 2.400.000 €
Season: 2014 – 2015

Capacity: 60 employees

Description:

Erection of complete connection piping on two units.

Conversion of Electrostatic Precipitator into Hybrid Filter – Plzen, Czech Republic

Customer: Hamon RC, Germany
Investor: Plzenska teplarenska, a.s., Czech Rep.

Value: 750.000 €
Season: 2014

Capacity: 30 employees

Description:

Manufacturing, supply, dismantling and erection of steel structures, plate-work, internal equipment (hybrid filter – ESP/bag-filter)

Sostanj power plant – 600 MWe, Slovenia

Customer: Alstom Power Stuttgart
Investor: Termoelektrarna Sostanj

Value: 10.000.000 €
Season: 2013 – 2014

Capacity: 135 employees

Description:

Erection of boiler
Packet 3, 4 and 5 including all the related site works.

Opatovice power plant, Czech Republic

Customer: Eletrárny Opatovice, a.s.
Investor: Eletrárny Opatovice, a.s.

Value: 10.000.000 €
Season: 2014 – 2015

Capacity: 120 employees

Description:

ZK - TERMOCHEM was engaged as EPC contractor for two projects:
1. Exchange of preheaters on 4 blocks
2. Replacement of precipitators
(Precipitators were realized in consortium with Hamon Environmental).

Mannheim power plant 900 MWe, Germany

Customer: Alstom Power Stuttgart
Investor: GKM AG

Value: 7.800.000 €
Season: 2013

Capacity: 130 employees

Description:

Erection works at boiler including packet 3 and 4.

Nikola Tesla Power plant, Serbia

Customer: Delegation of EU to the Republic of Serbia
Investor: PE ЕPS Belgrade - TENT B, Serbia

Value: 10.000.000 €
Season: 2011 – 2012

Capacity: 130 employees

Description:

Design, delivery of material and assembly for emission reduction. The project was realized in consortium with Hamon Environmental. ZK - TERMOCHEM was responsible for design (partly) and for delivery of material, prefabrication, assembly and all the related works on the site and commissioning.

Ledvice power plant, New Unit 660 MWe , Czech Republic

Customer: MODŘANY Power , a.s. (ŠKODA POWER, a.s., ŠKODA PRAHA Invest s.r.o.)
Investor: ČEZ, a.s.

Value: 10.000.000 €
Season: 2011 – 2014

Capacity: 100 employees

Description:

Erection of supercritical high pressure piping (including also pipes from material X10CrWMoVNb9-2 with wall thickness up to 82 mm).

Köln-NIEHL power plant, Germany

Customer: Voest Alpine Montage Austria
Investor: Siemens-Germany

Value: 1.200.000 €
Season: 2003 - 2004

Capacity: 50 employees

Description:

Fabrication and erection of internal connecting piping

Irsching power plant, Germany

Customer: Voest Alpine Montage Austria
Investor: EON Germany

Value: 1.250.000 €
Season: 2007 - 2008

Capacity: 50 employees

Description:

Complete fabrication and erection of high pressure pipe system

Tusimice Power Plant - 2x200 MWe – phase 1, Czech Republic

Customer: Vítkovice Power Engineering a.s. (MODŘANY Power, a.s., ŠKODA PRAHA Invest s.r.o.)
Investor: ČEZ, a.s.

Value: 2.800.000 €
Season: 2008 – 2009

Capacity: 54 employees

Description:

Critical high pressure piping OB61.

Tusimice Power Plant II - 2x200 MWe – phase 2, Czech Republic

Customer: MODŘANY Power, a.s. (ŠKODA POWER, a.s., ŠKODA PRAHA Invest s.r.o.)
Investor: ČEZ, a.s.

Value: 4.000.000 €
Season: 2010 – 2011

Capacity: 85 employees

Description:

Critical high pressure piping OB5 and OB61.

Moorburg power plant, Germany

Customer: HITACHI POWER SYSTEM
Investor: Vattenfall

Value: 4.000.000 €
Season: 2011 – 2012

Capacity: 75 employees

Description:

Erection of pressure piping
Package 4, units A + B.

Neurath Power plant - 2 x 1100 MWe, Germany

Customer: Alstom & Hitachi
Investor: RWE Germany

Value: 13.100.000 €
Season: 2009 - 2012

Capacity: 140 employees

Description:

ZK - TERMOCHEM was engaged in several parts of this project:
1. Erection of super-critical internal connection pipeline (package 3) for unit F and G
2. Erection of economiser and other works for unit F and G
3. Erection of ducts for unit G.

Knapsack Combined Cycle Gas Fired Power Plant, Germany

Customer: Voest Alpine Montage-Austria
Investor: Statkraft

Value: 1.200.000 €
Season: 2006 - 2007

Capacity: 50 employees

Description:

Fabrication and erection of high pressure steam pipeline.

Thermal power plant, Azerbaijan

Customer: VAM GmbH & Anlagentechnik und Montagen
Investor:

Value: 200.000 €
Season: 2007

Capacity: 30 employees

Description:

Prefabrication of pipes and piping components for conventional power plant in Azerbaijan.